Services

Installation and Commissioning

Installation and commissioning of growth chambers, walk-in rooms, autoclaves and laboratory instruments across India, with site-readiness checks, verification, IQ/OQ/PQ options and user training.
Engineer installing laboratory equipment

Installation and Commissioning of Laboratory Equipment

A correct installation decides how well a growth chamber, walk-in room or instrument performs for the rest of its life. JKG installs and commissions the equipment it supplies, checking the site, setting up the equipment and verifying that it holds the specified conditions before handing it over.
For walk-in rooms and larger systems we work with your engineering team on space, power, heat rejection, water and drainage well before delivery.
At a glance
Before delivery

Site Readiness for Equipment Installation

Space and access

Floor area, ceiling height and a delivery route wide and high enough for the equipment or room panels.

Power

Correct supply, outlets and, where needed, voltage stabilisation or back-up power.

Clearance and ventilation

Clearance around cabinets and a stable room temperature; reach-in chambers perform best near 24 °C and 50% RH.

Water and drainage

Demineralised water for humidity options and drains where required.

Heat rejection

Location of condensing units and how their heat will leave the room.

Gases and utilities

CO₂ or gas supplies for CO₂-controlled, anaerobic and hypoxia equipment.
On installation day

Commissioning and Handover

Installation

Assembly, levelling, connections and safety checks by trained engineers.

Commissioning

Start-up, controller set-up and checks that temperature, light, humidity or other parameters reach their set points.

Qualification

IQ/OQ or IQ/OQ/PQ documentation is available as an option for supported equipment.

Training

Hands-on training for users on operation, programming and routine care.

Documentation

Installation report and handover of manuals and warranty details.

Follow-up

Advice on preventive maintenance and AMC options for long-term reliability.

Brands We Service

JKG Universal SeriesPercivalPlant-DiTechPSITOMYUVITECMRC
Tender and compliance documents

Catalogues and Compliance Documents

Catalogues, datasheets and certificates for purchase files and government tenders. Need a document that is not listed? Ask us.
PDFService capability statementRequest →
PDFAMC terms and conditionsRequest →
PDFService report formatRequest →
PDFEngineer training certificatesRequest →
FAQ

Frequently Asked Questions

Answers to the questions we hear most. Can’t find what you need? Our team will help.

Space with clear access, the correct power supply, clearance around the equipment, and water, drainage or gas where the equipment needs them. We share a site-readiness checklist after your order.

JKG installs and commissions walk-in rooms once the site is ready, working with your engineering team on power, heat rejection, water and drainage.

Yes, as an option for supported equipment.

Yes. Users are trained on operation and routine care at handover.

Other services

Need Service Support for Your Equipment?

Tell Us About Your Equipment

Share your application and requirements, and our team will help you identify suitable equipment.